{"id":236612,"date":"2024-03-07T14:16:56","date_gmt":"2024-03-07T12:16:56","guid":{"rendered":"https:\/\/maritimes.gr\/?p=236612"},"modified":"2024-03-12T14:21:30","modified_gmt":"2024-03-12T12:21:30","slug":"macgregor-has-received-a-large-order-for-cranes-to-be-installed-onboard-a-state-of-the-art-cable-layer-due-delivery-from-global-shipbuilder-vard","status":"publish","type":"post","link":"https:\/\/maritimes.gr\/en\/macgregor-has-received-a-large-order-for-cranes-to-be-installed-onboard-a-state-of-the-art-cable-layer-due-delivery-from-global-shipbuilder-vard\/","title":{"rendered":"MacGregor has received a large order for cranes to be installed onboard a state-of-the-art cable layer due delivery from global shipbuilder VARD"},"content":{"rendered":"<p>MacGregor, part of Cargotec, has received a large order for three cranes that will be installed onboard a state-of-the-art cable layer due delivery from global shipbuilder VARD.<\/p>\n<p>The contract has been booked into Cargotec&#8217;s first quarter 2024 order intake, with crane supply scheduled for the third quarter of 2025. MacGregor will deliver a 100-tonne active heave-compensated (AHC) crane, a 20T Offshore crane and a 3T deck crane to Prysmian, to equip the Italian owner\u2019s third NB970 cable laying vessel from VARD.<\/p>\n<p>In addition, MacGregor has been contracted to supply its OnWatch solution, including 24\/7 technical service support worldwide. Developed for advanced subsea operations, the 191-metre long Prysmian cable layer will be capable of complex installation works, including simultaneous lay and burial with heavy-duty ploughs. It is equipped with cutting-edge DP3 positioning and seakeeping systems. At 19,000 tonnes, the vessel will take its place among the highest cable loading capacity ships in the market.<\/p>\n<p>MacGregor has been a reliable supplier for VARD on multiple projects over many years, said Pasi Lehtonen, Senior Vice President, Offshore Solutions.\u00a0\u201cThis is a significant order for MacGregor\u2019s offshore handling business, and we are pleased to supply VARD with yet another package of our high performance cranes,\u201d he said. \u201cThe market continues to respond well to our unique and modern designs, which combine resilience in service and lightweight round-shaped jibs.\u201d<\/p>\n<p>MacGregor\u2019s wide range of well proven AHC cranes, including its subsea cranes, offer accurate lifts in all conditions, including extreme environments with temperatures from plus to minus 40\u00b0C. They can be delivered with hydraulic or electric winch drives.<\/p>\n<p>The initial phase of construction on the new vessel will take place at Vard Shipyards Romania \u2013 Tulcea, with completion in Norway and handover to the owner due by the beginning of 2027.<\/p>\n<p><em><strong>MacGregor<\/strong> is a leader in sustainable maritime cargo and load handling with a strong portfolio of products, services and solutions, all\u00a0designed to perform with the sea.<\/em><\/p>\n<p><em>Shipbuilders, shipowners and operators are able to optimise the lifetime profitability, safety, reliability and environmental sustainability of their operations by working in close cooperation with MacGregor.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>MacGregor, part of Cargotec, has received a large order for three cranes that will be  [&#8230;]<\/p>\n","protected":false},"author":23,"featured_media":236613,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[273,298],"tags":[],"class_list":["post-236612","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-maritimes-news","category-seagoing-maritimes-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>MacGregor has received a large order for cranes to be installed onboard a state-of-the-art cable layer due delivery from global shipbuilder VARD - Maritimes<\/title>\n<meta name=\"description\" content=\"MacGregor, part of Cargotec, has received a large order for three cranes that will be installed onboard a state-of-the-art cable layer due de\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/maritimes.gr\/en\/macgregor-has-received-a-large-order-for-cranes-to-be-installed-onboard-a-state-of-the-art-cable-layer-due-delivery-from-global-shipbuilder-vard\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"MacGregor has received a large order for cranes to be installed onboard a state-of-the-art cable layer due delivery from global shipbuilder VARD - Maritimes\" \/>\n<meta property=\"og:description\" content=\"MacGregor, part of Cargotec, has received a large order for three cranes that will be installed onboard a state-of-the-art cable layer due de\" \/>\n<meta property=\"og:url\" content=\"https:\/\/maritimes.gr\/en\/macgregor-has-received-a-large-order-for-cranes-to-be-installed-onboard-a-state-of-the-art-cable-layer-due-delivery-from-global-shipbuilder-vard\/\" \/>\n<meta property=\"og:site_name\" content=\"Maritimes\" \/>\n<meta property=\"article:published_time\" content=\"2024-03-07T12:16:56+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-03-12T12:21:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/maritimes.gr\/wp-content\/uploads\/2024\/03\/MacGregor_cable-layer.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"677\" \/>\n\t<meta property=\"og:image:height\" content=\"375\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"maritimes\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"maritimes\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/maritimes.gr\/en\/macgregor-has-received-a-large-order-for-cranes-to-be-installed-onboard-a-state-of-the-art-cable-layer-due-delivery-from-global-shipbuilder-vard\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/maritimes.gr\/en\/macgregor-has-received-a-large-order-for-cranes-to-be-installed-onboard-a-state-of-the-art-cable-layer-due-delivery-from-global-shipbuilder-vard\/\"},\"author\":{\"name\":\"maritimes\",\"@id\":\"https:\/\/maritimes.gr\/#\/schema\/person\/7295cde1ca3b52f05bfbcccfd749ef9e\"},\"headline\":\"MacGregor has received a large order for cranes to be installed onboard a state-of-the-art cable layer due delivery from global shipbuilder VARD\",\"datePublished\":\"2024-03-07T12:16:56+00:00\",\"dateModified\":\"2024-03-12T12:21:30+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/maritimes.gr\/en\/macgregor-has-received-a-large-order-for-cranes-to-be-installed-onboard-a-state-of-the-art-cable-layer-due-delivery-from-global-shipbuilder-vard\/\"},\"wordCount\":368,\"image\":{\"@id\":\"https:\/\/maritimes.gr\/en\/macgregor-has-received-a-large-order-for-cranes-to-be-installed-onboard-a-state-of-the-art-cable-layer-due-delivery-from-global-shipbuilder-vard\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/maritimes.gr\/wp-content\/uploads\/2024\/03\/MacGregor_cable-layer.jpg\",\"articleSection\":{\"0\":\"Maritimes NEWS\",\"2\":\"Seagoing\"},\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/maritimes.gr\/en\/macgregor-has-received-a-large-order-for-cranes-to-be-installed-onboard-a-state-of-the-art-cable-layer-due-delivery-from-global-shipbuilder-vard\/\",\"url\":\"https:\/\/maritimes.gr\/en\/macgregor-has-received-a-large-order-for-cranes-to-be-installed-onboard-a-state-of-the-art-cable-layer-due-delivery-from-global-shipbuilder-vard\/\",\"name\":\"MacGregor has received a large order for cranes to be installed onboard a state-of-the-art cable layer due delivery from global shipbuilder VARD - Maritimes\",\"isPartOf\":{\"@id\":\"https:\/\/maritimes.gr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/maritimes.gr\/en\/macgregor-has-received-a-large-order-for-cranes-to-be-installed-onboard-a-state-of-the-art-cable-layer-due-delivery-from-global-shipbuilder-vard\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/maritimes.gr\/en\/macgregor-has-received-a-large-order-for-cranes-to-be-installed-onboard-a-state-of-the-art-cable-layer-due-delivery-from-global-shipbuilder-vard\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/maritimes.gr\/wp-content\/uploads\/2024\/03\/MacGregor_cable-layer.jpg\",\"datePublished\":\"2024-03-07T12:16:56+00:00\",\"dateModified\":\"2024-03-12T12:21:30+00:00\",\"author\":{\"@id\":\"https:\/\/maritimes.gr\/#\/schema\/person\/7295cde1ca3b52f05bfbcccfd749ef9e\"},\"description\":\"MacGregor, part of Cargotec, has received a large order for three cranes that will be installed onboard a state-of-the-art cable layer due de\",\"breadcrumb\":{\"@id\":\"https:\/\/maritimes.gr\/en\/macgregor-has-received-a-large-order-for-cranes-to-be-installed-onboard-a-state-of-the-art-cable-layer-due-delivery-from-global-shipbuilder-vard\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/maritimes.gr\/en\/macgregor-has-received-a-large-order-for-cranes-to-be-installed-onboard-a-state-of-the-art-cable-layer-due-delivery-from-global-shipbuilder-vard\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/maritimes.gr\/en\/macgregor-has-received-a-large-order-for-cranes-to-be-installed-onboard-a-state-of-the-art-cable-layer-due-delivery-from-global-shipbuilder-vard\/#primaryimage\",\"url\":\"https:\/\/maritimes.gr\/wp-content\/uploads\/2024\/03\/MacGregor_cable-layer.jpg\",\"contentUrl\":\"https:\/\/maritimes.gr\/wp-content\/uploads\/2024\/03\/MacGregor_cable-layer.jpg\",\"width\":677,\"height\":375},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/maritimes.gr\/en\/macgregor-has-received-a-large-order-for-cranes-to-be-installed-onboard-a-state-of-the-art-cable-layer-due-delivery-from-global-shipbuilder-vard\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0391\u03c1\u03c7\u03b9\u03ba\u03ae\",\"item\":\"https:\/\/maritimes.gr\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"MacGregor has received a large order for cranes to be installed onboard a state-of-the-art cable layer due delivery from global shipbuilder VARD\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/maritimes.gr\/#website\",\"url\":\"https:\/\/maritimes.gr\/\",\"name\":\"Maritimes\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/maritimes.gr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/maritimes.gr\/#\/schema\/person\/7295cde1ca3b52f05bfbcccfd749ef9e\",\"name\":\"maritimes\",\"url\":\"https:\/\/maritimes.gr\/en\/author\/maritimes\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"MacGregor has received a large order for cranes to be installed onboard a state-of-the-art cable layer due delivery from global shipbuilder VARD - Maritimes","description":"MacGregor, part of Cargotec, has received a large order for three cranes that will be installed onboard a state-of-the-art cable layer due de","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/maritimes.gr\/en\/macgregor-has-received-a-large-order-for-cranes-to-be-installed-onboard-a-state-of-the-art-cable-layer-due-delivery-from-global-shipbuilder-vard\/","og_locale":"en_GB","og_type":"article","og_title":"MacGregor has received a large order for cranes to be installed onboard a state-of-the-art cable layer due delivery from global shipbuilder VARD - Maritimes","og_description":"MacGregor, part of Cargotec, has received a large order for three cranes that will be installed onboard a state-of-the-art cable layer due de","og_url":"https:\/\/maritimes.gr\/en\/macgregor-has-received-a-large-order-for-cranes-to-be-installed-onboard-a-state-of-the-art-cable-layer-due-delivery-from-global-shipbuilder-vard\/","og_site_name":"Maritimes","article_published_time":"2024-03-07T12:16:56+00:00","article_modified_time":"2024-03-12T12:21:30+00:00","og_image":[{"width":677,"height":375,"url":"https:\/\/maritimes.gr\/wp-content\/uploads\/2024\/03\/MacGregor_cable-layer.jpg","type":"image\/jpeg"}],"author":"maritimes","twitter_card":"summary_large_image","twitter_misc":{"Written by":"maritimes","Estimated reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/maritimes.gr\/en\/macgregor-has-received-a-large-order-for-cranes-to-be-installed-onboard-a-state-of-the-art-cable-layer-due-delivery-from-global-shipbuilder-vard\/#article","isPartOf":{"@id":"https:\/\/maritimes.gr\/en\/macgregor-has-received-a-large-order-for-cranes-to-be-installed-onboard-a-state-of-the-art-cable-layer-due-delivery-from-global-shipbuilder-vard\/"},"author":{"name":"maritimes","@id":"https:\/\/maritimes.gr\/#\/schema\/person\/7295cde1ca3b52f05bfbcccfd749ef9e"},"headline":"MacGregor has received a large order for cranes to be installed onboard a state-of-the-art cable layer due delivery from global shipbuilder VARD","datePublished":"2024-03-07T12:16:56+00:00","dateModified":"2024-03-12T12:21:30+00:00","mainEntityOfPage":{"@id":"https:\/\/maritimes.gr\/en\/macgregor-has-received-a-large-order-for-cranes-to-be-installed-onboard-a-state-of-the-art-cable-layer-due-delivery-from-global-shipbuilder-vard\/"},"wordCount":368,"image":{"@id":"https:\/\/maritimes.gr\/en\/macgregor-has-received-a-large-order-for-cranes-to-be-installed-onboard-a-state-of-the-art-cable-layer-due-delivery-from-global-shipbuilder-vard\/#primaryimage"},"thumbnailUrl":"https:\/\/maritimes.gr\/wp-content\/uploads\/2024\/03\/MacGregor_cable-layer.jpg","articleSection":{"0":"Maritimes NEWS","2":"Seagoing"},"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/maritimes.gr\/en\/macgregor-has-received-a-large-order-for-cranes-to-be-installed-onboard-a-state-of-the-art-cable-layer-due-delivery-from-global-shipbuilder-vard\/","url":"https:\/\/maritimes.gr\/en\/macgregor-has-received-a-large-order-for-cranes-to-be-installed-onboard-a-state-of-the-art-cable-layer-due-delivery-from-global-shipbuilder-vard\/","name":"MacGregor has received a large order for cranes to be installed onboard a state-of-the-art cable layer due delivery from global shipbuilder VARD - Maritimes","isPartOf":{"@id":"https:\/\/maritimes.gr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/maritimes.gr\/en\/macgregor-has-received-a-large-order-for-cranes-to-be-installed-onboard-a-state-of-the-art-cable-layer-due-delivery-from-global-shipbuilder-vard\/#primaryimage"},"image":{"@id":"https:\/\/maritimes.gr\/en\/macgregor-has-received-a-large-order-for-cranes-to-be-installed-onboard-a-state-of-the-art-cable-layer-due-delivery-from-global-shipbuilder-vard\/#primaryimage"},"thumbnailUrl":"https:\/\/maritimes.gr\/wp-content\/uploads\/2024\/03\/MacGregor_cable-layer.jpg","datePublished":"2024-03-07T12:16:56+00:00","dateModified":"2024-03-12T12:21:30+00:00","author":{"@id":"https:\/\/maritimes.gr\/#\/schema\/person\/7295cde1ca3b52f05bfbcccfd749ef9e"},"description":"MacGregor, part of Cargotec, has received a large order for three cranes that will be installed onboard a state-of-the-art cable layer due de","breadcrumb":{"@id":"https:\/\/maritimes.gr\/en\/macgregor-has-received-a-large-order-for-cranes-to-be-installed-onboard-a-state-of-the-art-cable-layer-due-delivery-from-global-shipbuilder-vard\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/maritimes.gr\/en\/macgregor-has-received-a-large-order-for-cranes-to-be-installed-onboard-a-state-of-the-art-cable-layer-due-delivery-from-global-shipbuilder-vard\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/maritimes.gr\/en\/macgregor-has-received-a-large-order-for-cranes-to-be-installed-onboard-a-state-of-the-art-cable-layer-due-delivery-from-global-shipbuilder-vard\/#primaryimage","url":"https:\/\/maritimes.gr\/wp-content\/uploads\/2024\/03\/MacGregor_cable-layer.jpg","contentUrl":"https:\/\/maritimes.gr\/wp-content\/uploads\/2024\/03\/MacGregor_cable-layer.jpg","width":677,"height":375},{"@type":"BreadcrumbList","@id":"https:\/\/maritimes.gr\/en\/macgregor-has-received-a-large-order-for-cranes-to-be-installed-onboard-a-state-of-the-art-cable-layer-due-delivery-from-global-shipbuilder-vard\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0391\u03c1\u03c7\u03b9\u03ba\u03ae","item":"https:\/\/maritimes.gr\/en\/"},{"@type":"ListItem","position":2,"name":"MacGregor has received a large order for cranes to be installed onboard a state-of-the-art cable layer due delivery from global shipbuilder VARD"}]},{"@type":"WebSite","@id":"https:\/\/maritimes.gr\/#website","url":"https:\/\/maritimes.gr\/","name":"Maritimes","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/maritimes.gr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/maritimes.gr\/#\/schema\/person\/7295cde1ca3b52f05bfbcccfd749ef9e","name":"maritimes","url":"https:\/\/maritimes.gr\/en\/author\/maritimes\/"}]}},"_links":{"self":[{"href":"https:\/\/maritimes.gr\/en\/wp-json\/wp\/v2\/posts\/236612","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimes.gr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimes.gr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimes.gr\/en\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimes.gr\/en\/wp-json\/wp\/v2\/comments?post=236612"}],"version-history":[{"count":1,"href":"https:\/\/maritimes.gr\/en\/wp-json\/wp\/v2\/posts\/236612\/revisions"}],"predecessor-version":[{"id":236615,"href":"https:\/\/maritimes.gr\/en\/wp-json\/wp\/v2\/posts\/236612\/revisions\/236615"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimes.gr\/en\/wp-json\/wp\/v2\/media\/236613"}],"wp:attachment":[{"href":"https:\/\/maritimes.gr\/en\/wp-json\/wp\/v2\/media?parent=236612"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimes.gr\/en\/wp-json\/wp\/v2\/categories?post=236612"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimes.gr\/en\/wp-json\/wp\/v2\/tags?post=236612"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}